History
-
11 May 2026:
Tramway line 2 opens between Barreiros and Valongo (12 new stops).
-
1 February 2017:
Tramway line 1 is extended from Mascarenhas de Moraes to Barreiros and from Bernardino de Campos to Porto (5 new stops).
-
28 December 2016:
Tramway line 1 is extended from Pinheiro Machado to Bernardino de Campos.
-
10 April 2016:
Tramway line 1 opens between Mascarenhas de Moraes and Pinheiro Machado (9 stops).